Networks, diagrams and scheduling
Bachelor of Business Studies (BBS) — Fourth Year
Subject: Project Management (MGT 258)
Unit 3: Developing Project Plan
Academic Year: 2083/84
Topic Objectives
After studying this topic, students should be able to:
- Explain the scope and key elements of networks, diagrams and scheduling.
- Apply the relevant concepts to a defined organizational or venture situation using evidence and stated assumptions.
Curriculum Scope
- Developing project networks
- Basic rules to follow in developing project network
- Activity- on-arrow (AoA) diagrams, Activity-on-Node (AON), Scheduling
Detailed Microsyllabus
Network foundations
- Define activities and logical dependencies.
- Apply consistent network-development rules.
- Check completeness, cycles and sequencing.
Diagram methods
- Compare activity-on-arrow and activity-on-node representations.
- Use dummy activities only when required by the chosen method.
- Maintain unambiguous identifiers and relationships.
Scheduling
- Calculate early and late timings and float under stated assumptions.
- Identify critical paths.
- Assess resource and calendar constraints alongside network results.
Curriculum reference: Tribhuvan University, Faculty of Management, revised four-year BBS curriculum, PDF pages 124–125.
Source note: The curriculum scope above is retained from the existing TU syllabus breakdown. The numbered study subtopics are editorial elaborations for teaching and study, rather than a separately issued TU syllabus. Unit or component allocations apply at their stated level; no separate topic hours or marks are assigned here. Examples involving current laws, rates, institutional products or Nepalese status must identify the relevant period and official materials; no changing numerical or legal requirements are invented here.