Outsourcing, constraints, techniques and change
Bachelor of Business Studies (BBS) — Fourth Year
Subject: Project Management (MGT 258)
Unit 6: Projects Controlling
Academic Year: 2083/84
Topic Objectives
After studying this topic, students should be able to:
- Explain the scope and key elements of outsourcing, constraints, techniques and change.
- Apply the relevant concepts to a defined organizational or venture situation using evidence and stated assumptions.
Curriculum Scope
- Outsourcing: HR outsourcing, process outsourcing and project outsourcing, Control constraints – quality, cost and time
- Project control techniques
- Change control
Detailed Microsyllabus
Outsourcing
- Compare human-resource, process and project outsourcing.
- Assess competence, cost, control and dependency.
- Define deliverables and performance obligations.
Control constraints and techniques
- Coordinate quality, cost and time requirements.
- Select suitable progress and variance-analysis techniques.
- Assess contractual and information constraints.
Change control
- Evaluate proposed changes to scope or outsourced work.
- Obtain defined approvals and update agreements.
- Communicate impacts and monitor implementation.
Curriculum reference: Tribhuvan University, Faculty of Management, revised four-year BBS curriculum, PDF pages 124–125.
Source note: The curriculum scope above is retained from the existing TU syllabus breakdown. The numbered study subtopics are editorial elaborations for teaching and study, rather than a separately issued TU syllabus. Unit or component allocations apply at their stated level; no separate topic hours or marks are assigned here. Examples involving current laws, rates, institutional products or Nepalese status must identify the relevant period and official materials; no changing numerical or legal requirements are invented here.