Project planning and optimization
Bachelor of Business Studies (BBS) — Fourth Year
Subject: Event Management (MGT 257)
Unit 2: Events as Project
Academic Year: 2083/84
Topic Objectives
After studying this topic, students should be able to:
- Explain the scope and key elements of project planning and optimization.
- Apply the relevant concepts to a defined organizational or venture situation using evidence and stated assumptions.
Curriculum Scope
- Project planning and optimization
- Project Evaluation and Review Technique
- Project crashing
Detailed Microsyllabus
Planning and optimization
- Define activities, dependencies and resource requirements.
- Build an event schedule and identify constraints.
- Compare alternatives against time and cost objectives.
PERT
- Explain optimistic, most likely and pessimistic duration estimates.
- Calculate expected durations under the stated method.
- Interpret critical paths and uncertainty without claiming guaranteed timing.
Crashing
- Identify activities eligible for duration reduction.
- Compare incremental costs and achievable time savings.
- Recalculate the critical path and justify selected changes.
Curriculum reference: Tribhuvan University, Faculty of Management, revised four-year BBS curriculum, PDF pages 121–123.
Source note: The curriculum scope above is retained from the existing TU syllabus breakdown. The numbered study subtopics are editorial elaborations for teaching and study, rather than a separately issued TU syllabus. Unit or component allocations apply at their stated level; no separate topic hours or marks are assigned here. Examples involving current laws, rates, institutional products or Nepalese status must identify the relevant period and official materials; no changing numerical or legal requirements are invented here.